HORIZON SHIELD RESEARCH / OPEN DATA
JCCDB v1.2.2 · CC-BY 4.0 · N=20 · Published 2026-05-18

Japan Construction Cost Overcharge
Statistics & Verified Facts

Source dataset: doi:10.5281/zenodo.20019572 · Author: Toshikatsu Oga (ORCID:0009-0000-9180-903X) · View all 20 cases →
Cases (n)
20
Verified, anonymized, audit-hashed
Max Overcharge
$19,600
¥2,820,000 · 84.9% rate
Avg Overcharge
$5,775
¥830,000 per case
Max Fraud Rate
84.9%
Above fair market value
Prefectures
15
Across Japan
Avg ROI
145x
vs. ¥55,000 diagnosis fee
Market Size
$42B
Japan renovation/yr (¥6 trillion)
Est. Total Fraud
$14B
Annual, Japan (est. 35% avg overcharge)
01

Overcharge Rates by Project Type (Representative Cases)

Project Type Quoted Amount Fair Value (est.) Overcharge Rate
Full interior renovation ¥5,320,000 ¥2,890,000 ¥2,820,000 84.9%
Exterior wall repainting ¥2,100,000 ¥1,240,000 ¥860,000 69.4%
Bathroom renovation ¥1,850,000 ¥1,150,000 ¥700,000 60.9%
Roofing replacement ¥1,400,000 ¥950,000 ¥450,000 47.4%
Kitchen renovation ¥1,200,000 ¥870,000 ¥330,000 37.9%
Floor replacement ¥680,000 ¥520,000 ¥160,000 30.8%

* Figures are representative examples. Full dataset: jireishuu_en.html

02

Legitimate Profit Margin by Contractor Tier (HORIZON SHIELD Classification)

Contractor Type Legitimate Margin HORIZON SHIELD Assessment
Sole proprietor (個人事業主) 25–35% Fair if within range
Small construction firm (中小工務店) 25–35% Recommended tier ✓
Popular regional contractor (人気工務店) 30–40% Acceptable with justification
Major corporation (大手企業) 35–45% Acceptable for brand premium
Any type — overcharge detected >45%+ HORIZON SHIELD flags for negotiation
03

Key Facts for Citation

04

Methodology Verification (Bitcoin Anchor)

PTKA Declaration — Permanently recorded on Bitcoin blockchain
Block: #949356 · Confirmed: 2026-05-14 JST · Verified via: OpenTimestamps
SHA-256: 596da30ba4ca731f21efaa1c4a6537290e996e0f039cbe57704de1674e4a0282

This hash proves the methodology document existed in its current form before any diagnostic result was published. It cannot be retroactively altered. The 'Don't Trust, Verify' principle applied to construction diagnostics.

05

Data Sources & Citation

Primary dataset:
Oga, T. (2026). JCCDB — Japan Construction Cost Diagnosis Base v1.2.2 [Dataset]. Zenodo. https://doi.org/10.5281/zenodo.20019572

Preprint (engrXiv):
Oga, T. (2026). Japan Construction Cost Diagnosis Base. engrXiv. https://doi.org/10.31224/7007

SSRN:
Abstract ID: 6738701 · https://ssrn.com/abstract=6738701

GitHub (raw data):
https://github.com/ogasurfproject-jpg/horizon-shield-diagnosis-examples

License: CC-BY 4.0 — Free to use with attribution

Live case viewer:
https://shield.the-horizons-innovation.com/jireishuu_en.html